Building an ADU in Los Angeles? Metro LA Utility Trenching provides excavation for the underground utility routes that connect your new unit to the services it needs. We work with homeowners and project teams to plan the trenching around the approved design, property access and construction sequence.
Bring us your current plans and proposed connection points. We’ll review the excavation scope with you so the trenching, installation work and surface restoration are clearly accounted for before the job begins.
An ADU may need new runs for water, sewer, electrical conduit or communications. We review those routes together rather than treating each trench as an isolated job. The connection locations, required grade and separation, and surfaces being crossed all influence the excavation.
For a detached backyard unit, the work may run alongside an occupied home or across a driveway. For a garage conversion, the routes can be shorter but still involve concrete removal or working around existing lines. The approved plans determine which services your project needs.
Our ADU trenching work focuses on preparing the routes your utility trades need. We discuss excavation, bedding, backfill, compaction and surface restoration as part of the estimate, so you know which tasks are included and who is handling the remaining work.
We also provide electrical conduit trenching and water-line trenching. Pipe or conduit installation, final connections, testing and inspections should be identified in the agreed scope rather than assumed to come with excavation.
Getting equipment to the work area can be as important as the trench length. We review gate openings, side-yard clearance, overhead obstructions and space for excavated material. We also need to know which access routes residents must keep using during construction.
That review helps establish how the job can be carried out and what surface work is involved. Concrete or asphalt removal, restricted access, buried obstructions and disposal all affect the scope. Send access photos with your plans so those details can be considered from the start.
We start with the current site plan, utility routes and connection information, then review the access and excavation requirements. Before digging, the project needs the appropriate utility-location work and required approvals. Trench dimensions and service separation must follow the approved design and applicable utility requirements.
Work also needs to be coordinated with the installing trades and any inspections required before backfill. For planning references, the DigAlert safe-digging guide covers utility-location considerations, and LADBS ADU resources cover projects within the City of Los Angeles. An 811 request does not replace permits or inspections.
Send your project address, current site and utility plans, proposed connection points and photos of the access route. Let us know which surfaces need to be removed or restored and where the project stands with permits and construction scheduling.
We’ll discuss what is ready to price and what still needs to be resolved. Trench length alone does not account for access, depth, obstructions, disposal and restoration, so the quote should reflect the actual work at your property.
Contact Metro LA Utility Trenching to discuss your Los Angeles ADU project. Send the plans you have, describe the property access and tell us when the underground work needs to fit into your build.
© 2026 |Copy rights reserved